PROJECTS · PIPELINE OVERVIEW
11+ GW under orchestration design.
Sixteen projects across six U.S. states. Seven hyperscale-class, nine distributed DC-class. Project identifiers and site geography are withheld at this stage of the pipeline.
11+ GW
PIPELINE
16
PROJECTS
6
STATES
7
HYPERSCALE-CLASS
9
DISTRIBUTED DC-CLASS
01 · FOOTPRINT
Distributed by design.
Pipeline sites are distributed across six U.S. states, selected against transmission constraints, generation availability, and proximity to hyperscale demand. Coordinates abstracted — details gated.
02 · TAXONOMY
Two project classes.
CLASS A
7 projects
Hyperscale campuses
Gigawatt-class sites co-located with dispatchable generation and BESS. Designed from the transmission out, not from the meter in. Load profile: training + inference at frontier scale.
CLASS B
9 projects
Distributed DC-Class
Subsurface sites paired with surface-level generation. Targeted at workloads requiring exceptional physical security, thermal envelope, and long-duration energy availability.
03 · OPERATIONAL ASSET
An operational data center, acquired.
HyperBase acquired an operational data center from Shell for R&D and pilot validation. The site serves as the reference environment for Entropy™ dispatch testing against live workload signatures, away from the pipeline proper.
Asset details, operating telemetry, and pilot results are not disclosed on the public site.
04 · STRATEGIC
Partnership and government funding pipeline.
Active engagement with strategic partners and U.S. government funding vehicles aligned with domestic AI compute capacity and grid modernization. Specific counterparties and program affiliations are not disclosed here.